SPE-PRMS in plain terms: reserves, contingent and prospective resources
What 1P, 2P, 3P, 1C–3C and prospective resources actually mean, why commerciality decides the class, and how the system differs from the national classification used in Kazakhstan.
The Petroleum Resources Management System (PRMS) is the framework that investors, lenders, auditors and stock exchanges use to talk about oil and gas volumes. It is sponsored by the Society of Petroleum Engineers together with the WPC, AAPG, SPEE, SEG, SPWLA and EAGE; the current edition was approved in 2018. If your asset is going to be financed, sold, listed or audited, this is the language it will be judged in.
Three classes, decided by maturity and commerciality
PRMS sorts recoverable volumes by how mature the project is that would produce them — not only by how confident we are in the geology.
- Reserves — discovered, recoverable, commercial and remaining volumes from projects that are justified for development. Categorised as Proved (1P), Proved + Probable (2P) and Proved + Probable + Possible (3P).
- Contingent Resources — discovered and potentially recoverable, but not yet commercial: a market, an approval, a technology or a development decision is still missing. Categorised as 1C, 2C and 3C.
- Prospective Resources — undiscovered volumes estimated for prospects and leads, with a chance of discovery attached. Reported as low, best and high estimates (1U, 2U, 3U).
What 1P / 2P / 3P mean numerically
With a deterministic approach the evaluator assigns volumes to each category directly. With a probabilistic approach the categories correspond to confidence levels: there should be at least a 90% probability that the quantities actually recovered will equal or exceed 1P (P90), at least 50% for 2P (P50) and at least 10% for 3P (P10). The 2P estimate is the best estimate and is the figure most often used for valuation.
Commerciality is a test, not an assumption
To book reserves, the project must be economic under the evaluator's forecast of prices and costs, must have a reasonable expectation of all approvals, financing and market access, and development should start within a reasonable time — PRMS uses five years as a general benchmark unless a longer period is justified. Volumes beyond the licence or contract term can only be included where extension is reasonably expected.
Entitlement: whose barrels are they?
Reserves are reported as the share the company is entitled to under its contract — after royalties and, in production-sharing agreements, according to the cost-oil and profit-oil terms. Two companies in the same field can therefore report very different net reserves.
PRMS and the national classification in Kazakhstan
State reporting in Kazakhstan uses the national categories (A, B, C1, C2 and others) approved through the state reserves commission. There is no one-to-one mapping: C1 volumes may be proved, probable or even contingent under PRMS depending on commerciality and development plans. The transition towards internationally aligned reporting (KAZ-PRMS) makes it increasingly important to keep both views consistent and reconcilable.
What this means in practice
- Keep a single data set and two reconciled views — state balance and PRMS — rather than two separate studies.
- Document assumptions (prices, costs, development plan, contract terms) as carefully as the geology; auditors challenge them first.
- Review classification every year: commercial status changes even when volumes do not.
This article is general information, not advice on a specific asset. Reserves classification and reporting depend on the data, the contract and the applicable rules.
Need this applied to your field?
Tell us about the asset and the decision you have to make.
More from Insights
Working at international oil companies: a career lecture for students
How the industry is organised, how operators and service companies hire, and how to plan the first years of a career — watch the lecture by our founder Olzhas Suleimenov.
ReadEnergy of the future: a lecture for Kazakhstan students
Why oil forecasts go wrong, what salt and horses teach about energy transitions, and what it means for future petroleum engineers — watch the lecture by our founder Olzhas Suleimenov.
ReadDecline curve analysis: when it works and when it misleads
Arps decline curves are the fastest way to forecast a producing field — and one of the easiest to get wrong. A practical checklist for using DCA in a reserves evaluation.
Read