HomeInsightsWhat data you need for an SPE-PRMS reserves evaluation

What data you need for an SPE-PRMS reserves evaluation

A practical checklist of the geological, engineering, commercial and contractual data an evaluator will ask for — and the gaps that most often delay an audit.

Most delays in a reserves evaluation are not caused by the analysis but by the data room. Preparing the following before the work starts usually saves weeks and avoids conservative assumptions forced by missing information.

Subsurface

Production and wells

Development and costs

Commercial and contractual

Gaps we see most often: production not allocated by well, missing workover dates, outdated cost data and unsigned gas sales arrangements. Each of them forces the evaluator into conservative assumptions that reduce booked reserves.

How we work with incomplete data

Not every asset has a perfect data set. We start every engagement with a short data review, tell the client which gaps matter for the result and which do not, and document every assumption we have to make so that it can be revisited when better data arrive.

This article is general information, not advice on a specific asset. Reserves classification and reporting depend on the data, the contract and the applicable rules.

Need this applied to your field?

Tell us about the asset and the decision you have to make.

Discuss a project

More from Insights